News
WELLSVILLE — For the first time since 2017, Wellsville needed to erect the flood gate for possible flood control. Wellsville Fire Department, Wellsville Volunteer Fire Department, Highlandtown ...
Crow Wing County employee Lee Chambers fully opened the Black Bear Miller Lake Flood Control Gates on the Mississippi River located at the Mississippi River Trommald Boat Landing.
CEDAR RAPIDS, Iowa (KCRG) - Part of the new Cedar Rapids flood control system was put to the test today with workers making some upgrades to the gate system. The 16th Avenue bridge to NewBo or the ...
State and federal leaders are highlighting a $96 million project in Stockton to upgrade flood control protections for thousands of residents and property owners in the area of the Smith Canal.The ...
"We're not farmers, but we use flood waters to grow the grass." The problem is, these lift gates are not easy to open, or close. "They have to bring a forklift out," said Ladd.
Massive steel gate delivered for Fargo-Moorhead flood diversion project; $115M contract awarded Later this year construction will be under way for all three control structures and the 30-mile ...
Although the 12th Ave. flood gate is installed, there are still many steps left to complete the Flood Control System that still doesn’t have all the funding it needs.
As storms hit Napa, the flood gates located on McKinstry Street in the city of Napa will be closed Thursday, and they're expected to stay closed until the middle of ...
Results that may be inaccessible to you are currently showing.
Hide inaccessible results