News

Couldn't resolve component "default" at "/:pathMatch (.*)?/:lcsId ( [0-9]\- [0-9]\- [0-9]+| [0-9]- [0-9]- [0-9]+PT [0-9]+)" ...
Tango FLNG, delivered in 2017, has a storage capacity of 16,100 cubic meters of liquefied natural gas (LNG) and a liquefaction capacity of up to 0.6 million tons per year.
This new and advanced FLNG will feature a liquefaction capacity of 2.4 million tonnes per annum (mtpa), complementing the existing 600,000 tonnes per annum Tango FLNG, which has been in operation ...
To remind, Eni started the introduction of gas into the Tango FLNG unit moored in Congolese waters in late 2023. The Tango FLNG unit has a liquefaction capacity of about 1 billion cubic meters per ...
The Tango FLNG is owned by Export LNG Ltd., which Eni acquired from Exmar Group. It was built in 2017 and has a treatment capacity of about 3 million std cu m/d and an LNG production capacity of ...
Eni SpA E has initiated the first gas into the Tango floating liquefied natural gas (FLNG) facility, marking the Republic of the Congo’s inaugural natural gas liquefaction project. The ...
Tango FLNG will begin its activity in Congo in the second half of 2023, following the completion of mooring and connection works necessary to tie in with the Marine XII network and infrastructure.
Tango FLNG will be transported onboard Seaway 7’s Seaway Swan heavy-lift vessel to Luanda port in Angola, before being wet-towed northwards to the installation site offshore Pointe-Noire.
The FLNG will have a liquefaction capacity of 2.4 million tons per annum (MTPA) and will complement the existing Tango FLNG, which has a capacity of 0.6 MTPA and has been operational since ...
Tango FLNG, which has a liquefaction capacity of about 1 billion cubic metres per annum, is anchored in 40 metres of water off Pointe-Noire with the Eni-chartered, Exmar-owned Excalibur, which ...