News

Couldn't resolve component "default" at "/:pathMatch (.*)?/:lcsId ( [0-9]\- [0-9]\- [0-9]+| [0-9]- [0-9]- [0-9]+PT [0-9]+)" ...
Tango FLNG, delivered in 2017, has a storage capacity of 16,100 cubic meters of liquefied natural gas (LNG) and a liquefaction capacity of up to 0.6 million tons per year.
To remind, Eni started the introduction of gas into the Tango FLNG unit moored in Congolese waters in late 2023. The Tango FLNG unit has a liquefaction capacity of about 1 billion cubic meters per ...
This new and advanced FLNG will feature a liquefaction capacity of 2.4 million tonnes per annum (mtpa), complementing the existing 600,000 tonnes per annum Tango FLNG, which has been in operation ...
The Tango FLNG ship, 380 m long and 60 wide, will be anchored at a depth of around 40 m and will be able to store more than 180,000 cu m of LNG and 45,000 cu m of LPG.
Eni SpA E has initiated the first gas into the Tango floating liquefied natural gas (FLNG) facility, marking the Republic of the Congo’s inaugural natural gas liquefaction project. The ...
Tango FLNG will be transported onboard Seaway 7’s Seaway Swan heavy-lift vessel to Luanda port in Angola, before being wet-towed northwards to the installation site offshore Pointe-Noire.
Tango FLNG, which has a liquefaction capacity of about 1 billion cubic metres per annum, is anchored in 40 metres of water off Pointe-Noire with the Eni-chartered, Exmar-owned Excalibur, which ...